Home  /  The Work

THE WORK · RENOVATION STAGES · MELBOURNE

Work in progress:
the stages behind the finish.

I’m Ivan Bodnar, an independent home renovation specialist working as a sole trader in Melbourne. Most of a renovation happens before anyone sees the result. This page goes through the stages I carry out on bathrooms, kitchens and laundries, in the order they usually happen, so you know what’s going on in your room each week.

0413 142 055 · 9:00–18:00, Mon–Sun

STAGES ON THIS SHEET

01 · Stripping back

02 · Substrate preparation

03 · Plasterboard and jointing

04 · Tiling and flooring

05 · Painting

Alongside: licensed plumbing and electrical work, done by licensed specialists

BEFORE THE NEW ROOM GOES IN

Why the first three stages decide the last two

One of the most important lessons I’ve learnt is that good preparation matters just as much as the visible finish. Tiles, flooring and paint all sit on something. If that surface is uneven, damp or poorly fixed, the finish shows it sooner or later. That’s why the stages below spend more time on what’s underneath than on the final layer.

Every property is different, so the work needed depends on the condition of your room once it’s opened up. I explain what I find, what I’d recommend and why, before moving to the next stage. There’s more on this in Why Preparation Matters.

STAGE 01

Stripping back

Old tiles, worn finishes and damaged linings come out so the walls and floor can be seen properly. This is where hidden problems usually show up, and where the scope is confirmed against what’s actually there.

STAGE 02

Substrate preparation

The surfaces that will take tiles, flooring or paint are cleaned, repaired, levelled and primed. In a bathroom, this surface preparation gives the later stages a sound base. Any waterproofing or other regulated or specialist wet-area work is coordinated with appropriately qualified specialists as needed. It’s the least visible stage and often the one that takes the most care.

STAGE 03

Plasterboard and jointing

Worker applying joint compound along a wall-to-ceiling corner in a room with visible drywall seams and repairs.

Joint compound applied along a wall-to-ceiling corner, with plasterboard seams visible.

New or replacement plasterboard is fixed, then joints are taped, set and sanded until the wall reads as one flat surface. Rushed jointing shows through paint, especially under side light from a window.

A close-up of a person pressing a white rectangular tile into adhesive on a partially tiled wall, with another hand visible in the foreground.

Reference photo: a white wall tile pressed into adhesive, row by row.

STAGE 04

Tiling and flooring

With a sound, flat base, tiles go on in a planned layout. Cuts are placed where they’re least noticeable and lines are checked with a level as the work goes. Floors follow the same rule: the result depends on the surface underneath.

This is core hands-on work I do myself on bathroom, kitchen and laundry renovations.

STAGE 05

Painting

Last comes paint, over walls and ceilings that have already been patched, sanded and primed. Good paint only looks good when the stages before it were done properly.

ALONGSIDE EVERY STAGE

Licensed work, by licensed specialists

Plumbing, electrical and other regulated work often has to happen between these stages, for example before walls are closed in or tiles go on. I don’t personally carry out that work. Where it’s needed, I coordinate with appropriately licensed specialists so it fits the sequence and you know who is responsible for each part.

Read Working with Licensed Specialists for how that coordination works.

YOUR ROOM

Which stage is your room at?

Some homeowners come to me with a room that only needs stage five. Others need everything from stripping back onwards. When you get in touch, a short description helps me understand where to start:

  • Your suburb, whether that’s Murrumbeena or elsewhere in Melbourne
  • The room: bathroom, kitchen, laundry or another space
  • What’s worn, damaged or impractical right now
  • What you’d like the room to do differently

From there, I’ll talk you through the Assessment and Quotation Process. Any quotation depends on the assessed scope, materials and existing conditions. More tips are in What to Include When You Send a Message.