A bathroom renovation takes two kinds of time. First comes the time spent deciding and ordering. Then comes the time when the room is actually out of use. The first is usually longer than people expect. The second runs more smoothly when the first has been done properly. This guide takes you through both, stage by stage, and explains what makes each one run longer.
The stage numbers match our 12-stage bathroom renovation process.
01Why there is no single number
02Planning and lead time
03The build, trade by trade
04What stretches a timeline
05Keeping your schedule on track
Reference photo. The adhesive only goes on after the waterproofing membrane underneath has cured. That is one of several stages in a renovation that cannot be squeezed.
A like-for-like refresh of a small bathroom counts as a renovation. So does a full strip-out that moves the shower, relocates the toilet and adds a custom vanity. They are very different jobs, and their schedules differ too. You can only rely on a timeframe once the site has been assessed and the design and selections are settled, because those decisions set the scope. That is why the timeline belongs in the quote, not in a headline figure.
If you are weighing up a complete strip-out, Full Bathroom Renovations explains what that scope covers for homes in Murrumbeena, Carnegie, Hughesdale and Oakleigh.
The twelve stages fall into four blocks on the schedule board. Your bathroom is only out of use during the last two.
Consultation, assessment, design and quote. Decisions set the pace here: how many layouts you want to compare, how quickly you choose finishes, and whether the assessment finds something that changes the plan. None of this touches your bathroom. See Bathroom Design.
Tiles, tapware, the vanity, screens and cabinetry get ordered. Special-order items and made-to-measure joinery each have their own lead times. It is best to confirm the key items before demolition, so the room is never stripped out and left waiting for a delivery.
Demolition, plumbing and electrical rough-in, waterproofing and tiling. Each trade relies on the one before it, and the membrane has to cure before any tiles go down. Your bathroom is out of use for this block, and this is when hidden problems come to light.
The vanity, toilet, tapware and cabinetry go in. Glass screens are fitted, often measured against the finished tiles first. Then come silicone, cleaning and a final walk-through. These are small jobs, but each one needs its own tradesperson and its place in the order.
Six things lengthen a renovation more than anything else. You can plan for most of them during assessment and design.
Moving a shower, toilet or floor waste means new plumbing runs, and sometimes work on the floor as well. Leaving fixtures where they are is usually quicker.
An undecided tile or a back-ordered mixer can hold up a site that is otherwise ready. Choosing early is the simplest way to protect your schedule.
A made-to-measure vanity or storage unit is built to the room’s final dimensions, so its production has to be planned around the build. See Custom Cabinetry.
Waterproofing products need their specified curing time before tiling starts. This stage should not be rushed. Waterproofing explains why.
Water-damaged framing, a worn floor structure or damage from an old leak only show up once the tiles come off. They must be fixed before the build can continue. A shower that is already leaking is worth looking at early. See Leaking Shower Repairs.
The plumber, electrician, waterproofer, tiler and glazier work in a strict order. If one stage slips, every trade after it moves too. That is why good coordination matters as much as speed.
Settle the layout before you ask for a firm timeframe.
Confirm the tiles, tapware, vanity and screen before demolition.
Ask which items are special-order and plan around them.
Arrange another shower and toilet to use while the room is out of use.
Leave some breathing room for whatever demolition uncovers.
Agree how mid-build changes will be handled, because every change reshuffles the trades.
For the complete planning list, work through the Bathroom Renovation Checklist. When you want a timeframe based on your own room in Murrumbeena, Chadstone, Malvern East or Bentleigh East, request a free quote. You can also ask a question through the contact page.