Skip to main content

Bathroom Renovation Murrumbeena

Local service page

Bathroom Renovations Murrumbeena

Full bathroom rebuilds for Murrumbeena homes: strip-out, plumbing and electrical rough-in, waterproofing to AS 3740, tiling, joinery and fit-off, delivered on one contract with one point of contact.

Renovated Murrumbeena bathroom with walk-in shower, stone-look tiling and a wall-hung timber vanity
Completed rebuild: walk-in shower, full-height tiling and wall-hung vanity.

Service overview

We renovate bathrooms only. That narrow focus is why the sequence holds: the same plumber, waterproofer and tiler work through the same set-out every week, so there is no learning curve on your job.

A full renovation covers demolition and removal, any framing changes needed for a wider door or a new niche, plumbing and electrical rough-in, sheeting, membrane, screeds and falls, tiling, then vanity, toilet, screen, tapware, mirror, lighting, heating and exhaust. Painting and silicone finishing are included, and the site is cleaned before handover.

What you get out of it

  • A wet area built as one system, with falls set to the waste before any tile is cut.
  • A fixed written price naming each fixture, so a change of tapware does not turn into a variation argument.
  • A stage plan showing which trade attends on which day, issued before demolition starts.
  • Photographic records of the membrane at each coat, plus the waterproofing certificate at handover.
  • A defect walk-through with you, and the list closed out before the final payment.

Renovation process

Consultation, measure and quote, design and planning, demolition, plumbing and electrical, waterproofing and tiling, installation and finishing, final inspection. Eight stages in that order, with the cure times for membrane respected rather than shortened to make a calendar look better.

Materials and options

Tiles: large format porcelain, subway, hexagon mosaic and stone-look formats. Floors are slip-rated for wet areas, and mosaic is used in shower bases where a tighter grout grid helps the fall. Tapware in chrome, brushed nickel, gunmetal or matte black, with mixer cartridges we can still source parts for in ten years. Vanities wall-hung, floor-standing or built as custom joinery when the room is an awkward width. Screens frameless, semi-frameless or fixed panel.

01
Project examples

Recent Murrumbeena work

Neerim Road family bathroom

Hob removed, waste relocated, bath run converted to a full-width walk-in shower. 19 working days.

Poath Road ensuite

Door swing reversed, moulded base replaced with a tiled floor to a centre waste, full-height niche. 12 working days.

Murrumbeena Road shower repair

Failed membrane found under a leaking shower, floor rebuilt and re-tiled without touching the vanity wall.

02
FAQ

Questions about local jobs

Do you work on apartments and units in Murrumbeena?
Yes, provided owners corporation approval is in place. We supply the scope and waterproofing details owners corporations usually ask for as part of the application.
Can you match tiles to an existing floor?
Sometimes, if the range is still in production. If it is not, we will show you the closest current option and where the change of tile can be terminated so it reads as deliberate.
How far ahead do you book?
Start dates are usually a few weeks out, depending on the size of the job and lead times on your selections. We confirm the start only once materials are secured.